Cape Rock Bridge to Close July 5 – Aug. 13

cape-rock-drive-bridge
The bridge on Cape Rock Drive at Dennis Scivally Park will be demolished on July 5, 2013, starting at 7 a.m.  Cape Rock Drive should be open by August 13, weather-permitting. The bridge is located between Brookwood Drive and Howell St. Detour signs will be set up to guide motorists around the work area using Howell Street or Brookwood Drive.

Zoellner Construction  workers will remove the existing box culvert structure and replace it with a new single span bridge structure.  The contract amount is approximately $508,000. The project is funded through the 2008 Parks and Storm Water Tax initiative.

VIEW MAP

View Cape Rock Bridge Closed July 5 – in a larger map